As-Built Documentation for All Types of Work
- All types of work
- Finishing work
- Landscaping
- Ministry of Construction Order No. 344/pr dated 16.05.2023 (former RD 11-02-2006)
- Ministry of Construction Order No. 1026/pr dated 02.12.2022 (former RD 11-05-2007)
- Act of survey of the geodetic control network of a capital construction object
- Act of layout of the axes of the capital construction object on the ground
- Act of survey of hidden works
- Act of survey of critical structures
- Act of survey of engineering and technical communication network sections
- General work log
- Materials incoming inspection log
Load-Bearing and Enclosing Structures
- Pile installation
- Reinforced concrete foundation construction
- Steel structure installation
- Reinforced concrete structure installation
- Monolithic construction
- Masonry
- SP 70.13330.2012 (SNiP 3.03.01-87)
- Welding work log
- Assembly joints and nodes grouting log
- Welded joints anticorrosion protection log
- Concrete work log
- Building structures installation log
- Controlled tension bolted connections installation log
- Torque wrench calibration control log
Electrical Installation Work
- Power supply
- Electrical equipment
- List of technical documentation submitted during electrical installation work handover
- Act of technical readiness of electrical installation work
- List of changes and deviations from the project
- List of electrical installation deficiencies not preventing comprehensive testing
- List of installed electrical equipment
- Act of transfer of installed equipment for commissioning work
- Act of inspection of pipe conduits before closure
- Act of acceptance of trenches, channels, tunnels and blocks for cable installation
- Protocol of inspection and testing of cable insulation resistance on drum before laying
- Protocol of cable heating on drum before laying at low temperatures
- Act of inspection of cable conduits in trenches and channels before closure
- Cable laying log
- Overhead power line passport
- Act of measurements of actual clearances from overhead line conductors to crossed object
- Grounding device passport
- Title page
Low-Current Systems
- Structured cabling systems
- Security and fire alarm systems
- Act of completion of installation work
- List of installed equipment
- Act of equipment incoming inspection
- Act of measuring electrical wiring insulation resistance
- Act of testing protective pipes with separation seals for tightness
- Act of completion of commissioning work
Oil and Gas
- Special requirements for as-built documentation for construction and installation work at oil and gas facilities
- List to be agreed upon request
Process Equipment and Pipelines
- Process equipment installation
- Process pipeline installation
- SNiP 3.05.05-84
- VSN 478-86
- List to be agreed upon request
Automation Systems
- Automation systems installation
- As-built documentation section is under development
Material Incoming Inspection Acts
- Form 3.3 VSN 012-88 Part 2
- According to Gazprom PJSC form
- Concrete test protocols
- Electrode test protocols
Logs and Registers
- General work log
- Materials incoming inspection log
- As-built documentation register
- Hidden works inspection acts register
- Material quality certificates register